top | item 30452812

(no title)

koenneker | 4 years ago

I don't know about the trains but looking at shipping:

-Nordstream 2 has a capacity to transport 55 billion cubic meters per year[1]

-The biggest LNG transport ship "Mozah" built by Samsung Heavy Industries can transport a equivalent of ~162 million cubic meters in a single load

This leads to a ~339,5 full loads per year needed to replace the pipeline volume. Nordstream 2 probably wouldn't run at full capacity initially but even at 50% utilisation it would be nearly impossibe to replace it with shipping.

[1]https://www.gazprom.com/projects/nord-stream2/

[2]https://en.wikipedia.org/wiki/Mozah

discuss

order

kkjjkgjjgg|4 years ago

They don't need to replace something that doesn't even exist?

wukerplank|4 years ago

Nord Stream 2 was finished last year, it just isn't used yet.