patch_collector | 3 years ago
His greatest frustration was the lack of quality in the finished buildings he'd design. As he put it, the designs that Chinese firms were putting out were just as high quality as anything in the rest of the world, but the end result was always worse. It was largely procedural -- in the US, the architect is involved not only during the initial design phases, but throughout the project, and is responsible approving any changes and for certifying that the result matches the intent. In China, that's not the case -- they make a design, bundle it up, and then hand everything over the contractor. The contractor then makes whatever changes they want during the construction process, without any input from the architects. This means materials may get changed, the wrong construction methods may be used, etc, and no-one knows. From a distance, the building will look amazing, but the details will have been skimped on.
clairity|3 years ago
patch_collector|3 years ago
That said, I'm not certain that engineers are in a different situation. Judging by videos I've seen of collapsing buildings and other issues, I wouldn't be surprised if structural, electrical, plumbing, and other engineers also hand over their designs in the beginning, and then leave it to the developer / contractor to interpret them and 'value-engineer' as they see fit.