This is anecdotal, but back when I was working in architecture (10ish years ago), I visited the principal of our Chinese sister firm in Beijing, and we walked around and talked about his experience as a native Chinese architect with experience working in the US.

His greatest frustration was the lack of quality in the finished buildings he'd design. As he put it, the designs that Chinese firms were putting out were just as high quality as anything in the rest of the world, but the end result was always worse. It was largely procedural -- in the US, the architect is involved not only during the initial design phases, but throughout the project, and is responsible approving any changes and for certifying that the result matches the intent. In China, that's not the case -- they make a design, bundle it up, and then hand everything over the contractor. The contractor then makes whatever changes they want during the construction process, without any input from the architects. This means materials may get changed, the wrong construction methods may be used, etc, and no-one knows. From a distance, the building will look amazing, but the details will have been skimped on.

discuss

order

clairity|3 years ago

not keeping architects in the loop doesn't sound like that big of a problem, if it just affects the quality of the finish as noted. it'd be much more concerning if engineers weren't signing off on construction changes (which can happen here in the US, even with our bloated procedures).

patch_collector|3 years ago

The Architect of Record isn't just signing off on paint colors and finish quality, but on things like the seals around windows, flashing on roofing elements, fireproofing on the structural elements, and many more aspects of the building process. In the US, the vast majority of lawsuits around buildings are due to water infiltration, which is affected by these sorts of issues. The building may not collapse if the architect isn't reviewing it, but the walls and roof might.

That said, I'm not certain that engineers are in a different situation. Judging by videos I've seen of collapsing buildings and other issues, I wouldn't be surprised if structural, electrical, plumbing, and other engineers also hand over their designs in the beginning, and then leave it to the developer / contractor to interpret them and 'value-engineer' as they see fit.