top | item 36104787

(no title)

zenonu | 2 years ago

After I took ownership of my home, I cataloged over 100 issues that needed to be attended to post-construction. I want a home without obvious in-your-face-faults. The construction crew wanted to finish and move onto the next project. Our incentives were not aligned, and that's the problem.

Next time, I'm specifically going to ensure another contractor is hired to ensure QC of the home during construction. No moving onto the next stage until the 1 foot hole in the subfloor caused by a falling drill from the 2nd story is fixed.

discuss

order

No comments yet.