(no title)
NLips | 2 years ago
As okl said, it’s arguably terminology, and maybe high and low level requirements would work for you? I prefer to separate out the terms though, so that “requirements” are the thing that the engineering team can’t unilaterally change without upsetting the stakeholders. If I can change a spec item mid-delivery and it doesn’t matter to the customer, then it wasn’t a requirement. If I can’t change it, then it’s a requirement.
No comments yet.