(no title)
eckesicle | 11 months ago
The blog poster could’ve asked, why does the manager want me to deliver the story points? It’s because Jake is also delivering zero story points and he’s a terrible engineer and it’s a good canary metric.
eckesicle | 11 months ago
The blog poster could’ve asked, why does the manager want me to deliver the story points? It’s because Jake is also delivering zero story points and he’s a terrible engineer and it’s a good canary metric.
No comments yet.