top | item 4511294

(no title)

billswift | 13 years ago

The larger the team, the more overhead is needed, no matter what system you are using. The real problem is that scrum doesn't scale as efficiently as more structured management systems, so the overhead grows much faster than in most other systems as team size increases.

ADDED: Conversely, with small teams, the overhead of more formal methods doesn't scale down; that is where less structured methods like scrum are most efficient.

discuss

order

No comments yet.