(no title)
reachableceo | 5 months ago
In my mind , the labor rate for a professional is a minimum of 1.00 per minute. This package would be essentially one hour of billable time at the (lowest) rate a professional would bill themselves out at.
Presuming it’s FLO or at least some kind of simple AT command set and meets all the other requirements, I’m really struggling to understand how it’s expensive ?
I mean , sure if you need 10k of them or something.
Are people really this price sensitive ?
numpad0|5 months ago
It's not rare these days for people outside Asia to have completely broken mental math of engineering man-hours required for a product or how extremely subsidized the products in their hands are. iPhones can be bought for $499 not because they've figured out AI design and robotic mass production over in China, it's because they're leaving $2k-4k per unit on the table to be blown away in wind. And ultimately it's because that money is only nicety to them, not vital.
Which means, if you do the labor on your soil, your local economy will demand that amount to be on table plus some, counted, bound, and placed under a weight.
manwe150|5 months ago