I never said it wasn’t created by Bluesky, so I’m really not sure why you’re trying to argue that I am. The point is that PLC is usable as a DID method for things that aren’t atproto.
The ID is deterministic, you can reconstruct it by hashing the genesis entry in the audit log.
unknown|4 months ago
[deleted]