(no title)
crispyambulance | 1 month ago
It wasn’t really a “design flaw” or “weak link” as much as it was management disregarding the warnings of engineering staff. The cold temperature limitation was known in advance by the Morton Thiokol engineers but their management refused to relay the warnings of engineering to NASA and NASA was under pressure to fly. IMHO this was a failure of multiple, mostly organizational, systems rather than “one weak link”.
Did the economists mis-name their own theory?
sidewndr46|1 month ago
jjk166|1 month ago