bgribble | 1 month ago
They would much rather confidently repeat a date that is totally unfounded rubbish which will have to be rolled back later, because then they can blame the engineering team for not delivering to their estimate.
bgribble | 1 month ago
They would much rather confidently repeat a date that is totally unfounded rubbish which will have to be rolled back later, because then they can blame the engineering team for not delivering to their estimate.
pocketarc|1 month ago
Having a promised date lets you keep the opportunity going and in some cases can even let you sign them there and then - you sign them under the condition that feature X will be in the app by date Y. That's waaaay better for business, even if it's tougher for engineers.
loloquwowndueo|1 month ago
I’ve seen enough instances of work being done for a specific customer that doesn’t then result in the customer signing up (or - once they see they can postpone signing the big contract by continuing to ask for “just one more crucial feature”, they continue to do so) to ever fall for this again.
ravloony|1 month ago
devsda|1 month ago
xyzzy123|1 month ago
In Australia, an SDE + overhead costs say $1500 / work day, so 4 engineers for a month is about $100k. The money has to be allocated from budgets and planned for etc. Dev effort affects the financial viability and competitiveness of projects.
I feel like many employees have a kind of blind spot around this? Like for most other situations, money is a thing to be thought about and carefully accounted for, BUT in the specific case where it's their own days of effort, those don't feel like money.
Also, the software itself presumably has some impact or outcome and quite often dates can matter for that. Especially if there are external commitments.
mactavish88|1 month ago
1. Think about what product/system you want built.
2. Think about how much you're willing to invest to get it (time and money).
3. Cap your time and money spend based on (2).
4. Let the team start building and demo progress regularly to get a sense of whether they'll actually be able to deliver a good enough version of (1) within time/budget.
If it's not going well, kill the project (there needs to be some provision in the contract/agreement/etc. for this). If it's going well, keep it going.
pluralmonad|1 month ago
Nextgrid|1 month ago
But when you get paid less than half that it doesn’t feel like a problem to worry about. At 300/day of take-home pay, one more day here or there really isn’t going to make a difference.
the_af|1 month ago
I've made your argument before, but realistically, much of the word revolves around timelines and it's unreasonable to expect otherwise.
When will you recover from your injury so you can play the world cup?
When will this product arrive that I need for my child's birthday?
When will my car be repaired, that I need for a trip?
How soon before our competitors can we deliver this feature?
"It'll be done when it's done" is very unsatisfying in a lot or situations, if not downright unacceptable.
AnimalMuppet|1 month ago
But the problem is, the sales world has its own reality. The reality there is that "we don't know when" really is unacceptable, and "unacceptable" takes the form of lost sales and lost money.
So we have these two realities that do not fit well together. How do we make them fit? In almost every company I've been in, the answer is, badly.
The only way estimates can be real is if the company has done enough things that are like the work in question. Then you can make realistic (rough) estimates of unknown work. But even then, if you assign work that we know how to do to a team that doesn't know how to do it, your estimates are bogus.
iamflimflam1|1 month ago
If you had a deadline - say thanksgiving or something - and you asked “will the work be done by then” and the answer was “I’m not going to tell you” would you hire the person?
The no estimates movement has been incredibly damaging for Software Engineering.
Rotundo|1 month ago
"I'd like to have my roof reshingled, but with glass tiles and it should be in the basement, and once you are half way I'll change my mind on everything and btw, I'm replacing your crew every three days".
narmiouh|1 month ago
I guess a fair analogy would be if the home owner just said “Make my home great and easy to use” by Thanksgiving without too many details, and between now ans thanksgiving refines this vision continuously, like literally changing the color choice half way or after fully painting a wall… then its really hard to commit.
If a home owner has a very specific list of things with no on the job adjustments, then usually you can estimate(most home contract work)
All software requests are somewhere in between former and latter, most often leaning towards the former scenario.
masterj|1 month ago
If it’s something where they have fewer unknowns and more control and lots of experience building the same thing, then I would expect an estimate: building a deck, re-roofing a house, etc
tayo42|1 month ago
adrianN|1 month ago
geetee|1 month ago
bsoles|1 month ago
When you ask for a firm estimate, you are basically asking to be lied to, and the contractor happily complies by telling you a lie.
genghisjahn|1 month ago
carefulfungi|1 month ago
mcfly_c-137|1 month ago
Personally I consider it more important to constantly narrow down any uncertainties over time, than having an initial estimate that holds. The closer it gets to any deadline, the less uncertainty I want (need) to have because the less options remain to react to changes.
And frankly, this usually not only applies to estimates but also to things that these estimates rely upon. The longer the timeline, the more room for circumstances and requirements to change.