top | item 46759546 (no title) Azrael3000 | 1 month ago Not necessarily, the measurement train my company develops can go up to 100 km/h and measure certain rail features every 5mm at that speed. discuss order hn newest lefra|1 month ago 100 km/h is slow compared to passenger train (even non-high-speed ones). Depending on how packed the schedule is, it might not be possible to analyse track during the day without causing backups.
lefra|1 month ago 100 km/h is slow compared to passenger train (even non-high-speed ones). Depending on how packed the schedule is, it might not be possible to analyse track during the day without causing backups.
lefra|1 month ago