top | item 46946647 (no title) javcasas | 20 days ago When the expectation is 100x, then it is work 100% of the time at maximum speed. discuss order hn newest falcor84|20 days ago And that brings us back to square one - if everyone is a 100x engineer, then everyone's again a 1x engineer. Lewis Carroll nailed it with the Red Queen's Race.
falcor84|20 days ago And that brings us back to square one - if everyone is a 100x engineer, then everyone's again a 1x engineer. Lewis Carroll nailed it with the Red Queen's Race.
falcor84|20 days ago