top | item 47110637

(no title)

qoez | 7 days ago

> It took them two months, to develop chip for Llama 3.1 8B. In the AI world where one week is a year, it's super slow. But in a world of custom chips, this is supposed to be insanely fast.

LLama 3.1 is like 2 years at this point. Taking two months to convert a model that only updates every 2 years is very fast

discuss

order

ac29|7 days ago

2 months of design work is fast, but how much time does fabrication, packaging, testing add? And that just gets you chips, whatever products incorporate them also need to be built and tested.

wmf|7 days ago

It only looks that way because Llama failed. Good models like Qwen are shipping every 6 months.