(no title)
xxs | 6 days ago
It was with regard that 800V was the driving factor, it'd be possible to have 'fast' charging earlier with existing infrastructure, even home.
>be safely charged with the said 3 phases?
The limiting factor for charging would be charging current in lots of cases. Getting 60% of 75kWh battery, it's 45kWh to charge in 20mins, the output should be ~150kW (90% efficiency) or 325A (on 400v), 4x 12-15mm wires.
Note about 'home' charging - three phase 32A is widely available domestically or around 6-8h to fully charge
No comments yet.