I don't think there's a way to do this without casting something to connect the pre-fab to the surrounding concrete sidewalk. Like how do you precisely cut out the existing curb so the prefab just fits (including elevation/slope) without excessive gaps or something? And if you're pouring concrete anyway, might as well pour the curb itself.
lstodd|4 days ago